Request a Stormwater Drainage and Access Inspection

  • Use this form to request a Stormwater Drainage and Access inspection from our Development Engineering Team.    
  • This inspection is required as part of the planning permit process.

There are two types of inspections involving drainage and access that may be required under a Planning Permit. These inspections can be booked online using this form:-

  • Approved Stormwater Management Plan final inspection
  • Drainage and Access Planning Permit condition - inspection for Statement of Compliance

If your Approved Planning Permit was for Subdivision only and you require a Drainage and Access inspection, you will be required to pay the inspection fee upon submission of this booking request.

Please note:

Do not use this inspection request form for the following: 

Please allow 5 business days from lodgement of request for the inspection to occur.

  • Planning Permit Number i.e. T12345 (5 numbers)
  • Planning Permit Condition Number
  • Property Address 
  • Name and mobile number of the contact person for this site
  • Copy of stamped approved Drainage/Stormwater Management Plans (if applicable).
  • All pits and pipes flushed clean and pit floors invert shaped to prevent water ponding
  • All pipe ends cut flush to pit walls and rendered around
  • All areas of road reserve reinstated
  • Signage and line marking installed in accordance with approved plans, i.e. disabled parking, private street signs, traffic calming devices in place if a condition of the permit
  • Detention system, rainwater tanks or any on-site water quality treatment systems as per approved plan, i.e. –
  • rainwater tank overflow connected to stormwater system
  • retention orifice connected to stormwater
  • All surfaces to be to “finished surface level” as per approved plan.

Request a stormwater drainage & access inspection